BACKGROUND:

Partnering in 2020 with the Sorgiovanni brothers who were the original owners of “Harvey Fresh Milk” our task was to fire engineer, design/construct and commission the completed fire services package for the distribution hub currently occupied by Lactalis Corporation.

CHALLENGES:

Lactalis required a live building at all times for the distribution of milk and juices. This was a challenge as half the new building would be over lapping the existing building.

SOLUTIONS:

As a result the new build would need to be completed in two stages. Stage one included installing all the infrastructure for the fire system including;

  • Fire Hydrant Ring Main
  • Dual Fire Water Storage Tanks
  • Dual Diesel Fire Pumpset
  • Fire Detection System
  • Occupant Warning System
  • Evacuation Diagrams
  • Fire Extinguishers

Once stage one was completed the tenant was able to relocate trouble free which allowed for the old building to be knocked and Stage 2 to commence.

This was a great outcome for both our client and tenant.

PROJECT VALUE:

$5 Million